Jóhannes Steingrund has been part of the technical team at the G! Festival every single year.
Today, he is the owner and director of the company Steingrund Akustik, which, together with a large technical team, ensures that the music at the festival sounds exactly as it should.
This year, the technical team consists of about 30 people. They are divided among the three stages located on the beach, at the playground, and in the barn. Additionally, the technical team handles smaller technical tasks, such as the disco that was set up in the camping area on Wednesday evening.
Many musicians and bands have stood on the stage at G! over the years. But one performance in particular stands out in Jóhannes’s memory.
“The highlight was probably when Europe played in 2005. I mixed the monitor sound for them back then, and that was absolutely massive,” he says.
The monitor sound is the audio that the musicians themselves hear on stage. It is crucial for ensuring that they can hear both themselves and the other musicians while they play.
However, it is not only the positive musical experiences that Jóhannes looks back on.
One of the biggest challenges occurred in 2010, when heavy surf caused the beach stage to warp, making it unusable.
“We had to find a quick solution and set up a new stage on the asphalt. The playground suddenly became the main stage,” Jóhannes says.
The sudden shift meant that both equipment and artists had to be moved between stages on very short notice.
“The bands had to be moved from the beach up to the playground, and from the playground down to the other stage. It was absolute chaos,” he says.
Even though much has changed since G! was first held, the mission for Jóhannes and his technical team remains the same: to ensure that both the musicians and the festival-goers get an excellent sound experience.
Source: kvf.fo
